Mancini Design provides custom residential design, planning permits, heritage overlay applications and construction documentation from St Kilda, across Melbourne. I’m an independent building designer and registered building practitioner with 30 years in the construction industry. I don’t build, so the design is settled before you choose a builder. I work with experienced professional consultants as each project needs them.
What kinds of projects do you take on?
Projects of every size, from a single-room extension to a unit development. What a project needs depends on the site: some need a planning permit and some don’t, and most structural work needs an engineer. I work out which approvals your project needs and line them up in the right order, so you can get started sooner.
Extensions
Single-room extensions through to larger rear and side extensions. Whether a planning permit is needed depends on the zone, the lot size and any overlays. A building permit is needed, and an engineer designs the footings and structure. Examples: Daylesford Retreat and Albert Park Terrace. See house extension design in Melbourne, or read what to check before extending a house.
Upper-floor and second-storey additions
Adding a level, or building over a garage. An engineer checks that the existing structure can carry the new floor, and overlooking, overshadowing and height usually decide the design and whether a planning permit is needed. Examples: the first-floor addition at Albert Park Terrace, and a recent soundproofed music room built over a garage in a two-storey home.
Internal remodelling
Reworking kitchens, living areas, bathrooms and layouts inside the existing house. If the house doesn’t get bigger and no overlay applies, a planning permit is often not needed, but removing walls is structural work that needs an engineer and a building permit. Examples: the Hampton Remodel and the internal alterations at Daylesford Retreat.
New homes and knock-down rebuilds
Designing a new home on your block, including demolishing the existing house. Whether a planning permit is needed depends on the zone, the lot size and any overlays. Examples: the St Kilda Residence, Glen Waverley Living and the Patterson Lakes Home.
Unit developments
Two dwellings to six or more, depending on the block and its constraints. Building two or more dwellings on a lot needs a planning permit and has to meet Clause 55 (the Townhouse and Low-rise Code). See feasibility checks before developing units in Victoria. Examples: Bentleigh Residence, Beaumaris Project, Parkdale Residence and Edithvale Coastal.
Granny flats and small second dwellings
A self-contained second home of up to 80 m² behind the existing house, to rent out, for an elderly parent or relative, or so an adult son or daughter can have some independence. A building permit is needed, and whether a planning permit is needed as well depends on the lot size, the zone and any overlays. Not sure your block can take one? The Granny Flat Planning & Feasibility Report checks first, and its fee is deducted from your design fee invoice if you go ahead with a design fee of $2,500 or more excluding GST. It is not a cash refund.
Buying a property for one of these? The Planning, Feasibility & Risk Report checks whether the site will take it before you commit.
How does a project with Mancini Design run, step by step?
It starts with a free conversation, then a charged site visit and assessment that leads to a written fee proposal. From there I develop the design with you, prepare the planning application if one is needed, and produce the documentation for your building permit.
| Stage | What happens | What you get |
|---|---|---|
| 1. Initial conversation (free) | We talk by phone or email about your site, your lifestyle and your goals. | A clear next step, with no obligation. |
| 2. Site visit and assessment (charged) | I visit the site and prepare a professional assessment. | The assessment and a written fee proposal. |
| 3. Concept and design | I develop concept options and refine them with you until the design feels right. | A developed design, ready for the permit stages. |
| 4. Planning permit (if required) | I prepare and lodge the application and respond to council’s requests for further information, with consultants such as town planners where needed. | Planning drawings and the application, managed through to council’s decision. |
| 5. Construction documentation | I prepare the documentation your building surveyor and builders need, coordinated with engineers and surveyors. | Building permit drawings and documentation addressing the Building Regulations and the NCC. |
| 6. Design intent checks (on request, charged) | At key stages I check the build follows the design. Not a compliance, structural or permit inspection. | A report documenting where the build follows or departs from the design. |
Building design
Designing a new home, knockdown-rebuild, renovation or extension, from brief and concept through to a resolved design.
Who needs it: Homeowners and small developers who want the design worked out properly before committing to a builder.
What you get: Concept options, a developed design refined with you, and drawings ready for the permit stages.
How it starts: a free initial conversation by phone or email. A site visit and a professional assessment are charged, and lead to a written fee proposal.
Planning permits
Preparing and lodging planning permit applications under the relevant Victorian planning scheme, and responding to council’s requests for further information.
Who needs it: Anyone whose project is affected by a zone or overlay trigger, for example a Heritage Overlay, a Design and Development Overlay, or ResCode (Clauses 54 and 55) on smaller lots.
What you get: Planning drawings and the application, coordinated with consultants such as town planners where needed, managed through to council’s decision.
How it starts: a free initial conversation by phone or email. A site visit and a professional assessment are charged, and lead to a written fee proposal.
What is the difference between a planning permit and a building permit in Victoria?
A planning permit decides whether you can use or develop the land the way you propose under the local planning scheme. A building permit confirms the construction meets the building regulations and the National Construction Code. Many projects need both, and the planning permit comes first.
| Planning permit | Building permit | |
|---|---|---|
| Purpose | Whether the use or development is allowed under the planning scheme: zones, overlays and provisions such as ResCode. | Whether the construction complies with the Building Regulations 2018 and the National Construction Code. |
| Issued by | The responsible authority, usually the council, under the Planning and Environment Act 1987. | A registered building surveyor, either council’s municipal surveyor or a private surveyor you appoint, under the Building Act 1993. |
| When it’s needed | When a zone, overlay or particular provision triggers a permit, for example a Heritage Overlay. | For most building work, before construction starts. |
| Order | First, where one is required. | After any required planning permit. It can’t be issued before. |
| Decision time | Council has 60 days (the prescribed time). If council asks for further information, the 60 days run from when that information is given. If council doesn’t decide in time, you can apply to VCAT. | Depends on the building surveyor and how complete the documentation is. |
Sources: Planning Victoria: Planning permits (Planning and Environment Act 1987 s79; Planning and Environment Regulations r32); BPC: When is a building permit required?; BPC: Appointing a building surveyor.
Heritage overlays
Designing and documenting changes to properties in a Heritage Overlay (Clause 43.01), so the design responds to council’s heritage policy from the start. Read the St Kilda and Port Phillip heritage guide.
Who needs it: Owners planning to demolish, extend, alter or build in a heritage area, including much of St Kilda and Port Phillip.
What you get: A heritage-responsive design and the planning application, including the information council asks for under the overlay schedule.
How it starts: a free initial conversation by phone or email. A site visit and a professional assessment are charged, and lead to a written fee proposal.
Construction documentation
Preparing the documentation your building surveyor needs for a building permit, and that builders need to price and build from.
Who needs it: Projects moving from planning approval to building permit, or projects that don’t need a planning permit at all.
What you get: Building permit drawings and documentation addressing the Building Regulations and the National Construction Code (NCC), coordinated with engineers and surveyors.
How it starts: a free initial conversation by phone or email. A site visit and a professional assessment are charged, and lead to a written fee proposal.
Other services
- Report and Consent applications where a design doesn’t meet a siting rule in Part 5 of the Building Regulations 2018.
- Passive House principles and sustainable design. Read the Passive House guide.
- Development design advice on feasibility, site potential and planning constraints.
- Subdivision documentation for multi-lot residential development.
- Parking waiver applications.
- Design for builders and developers, for a builder’s client or a development site.
- Side and rear setback calculator, a free tool for Clause 54 and 55 wall heights.
- Planning, Feasibility & Risk Report before you buy.
Design intent checks during construction (on request)
On request only, as a charged service, I check the build follows the design and give you a report documenting whether and where it has strayed. It is not a compliance, structural or building permit inspection, and I don’t manage or direct the builder. Full scope and exclusions.
Not sure whether to use an independent designer or a design-and-build company? Read the comparison.
★★★★★
“His attention to detail, understanding of construction and ability to produce clear and accurate plans makes the building process much easier… He understands what builders need and is always willing to work through any issues to achieve the right outcome.”
John F., Google review
How much does building design cost?
I can’t give a fixed price for design work until I understand the site and the brief. Every project gets a written fee proposal setting out exactly what’s included before any work begins. The first conversation is free; a site visit and a professional assessment are charged, and that assessment is what makes an accurate fee proposal possible.
What affects the cost?
- Type and size of project: a single-storey extension is a different scope from a new multi-storey home or a unit development.
- Site constraints: overlays (heritage, design and development, flood), easements, protected trees, slope and narrow blocks all add design and approval work.
- Approvals needed: whether the project needs a planning permit, Report and Consent, section 29A demolition consent or a build-over-easement consent, and whether objections are likely.
- Consultants: town planners, engineers, surveyors and other specialists, as the project needs them.
- Level of documentation: how much detail and specification you want resolved before pricing with builders.
- Construction-stage services: builder enquiries, site visits and additional drawings or details during construction are charged at an hourly rate, because their extent can’t be known in advance. Design intent checks are optional and also charged separately.
How does the fee proposal process work?
- Free initial conversation by phone or email about your site and what you want to achieve.
- Site visit and professional assessment (charged), where I look at the site’s possibilities and constraints and give you initial feedback.
- Written fee proposal for your specific project, listing what’s included. Third-party costs are listed separately: consultants, and statutory fees such as council planning application fees, which are set by Victorian regulations.
Buying a property? The Planning, Feasibility & Risk Report is a fixed-price service: the Desktop Report, $495 including GST. Planning a rooming house? See the Rooming House Planning & Feasibility Report, also $495 including GST. An onsite visit can be arranged if required or requested, at an additional fee of $350 including GST.