By Phillip Mancini, registered building practitioner · Last updated 24 October 2026

Glen Waverley Living is a new family home with a basement on a sloping site in the City of Monash, under both a Special Building Overlay for overland flow and a Vegetation Protection Overlay. The floor levels sit above the flood level, the basement drainage was designed with the civil engineer, and the upper floor works around protected trees.

Glen Waverley Living at a glance
LocationGlen Waverley, Victoria
CouncilCity of Monash
Project typeNew single-family home with basement
Planning controlsSpecial Building Overlay (SBO); Vegetation Protection Overlay (VPO1)
StatusPlanning and building permits obtained
DesignerPhillip Mancini, Mancini Design

What were the challenges?

The site is covered by a Special Building Overlay, which deals with overland stormwater flow, and a Vegetation Protection Overlay (VPO1), which protects trees.

Digging a basement meant keeping overland flow paths working and avoiding damage to the roots of protected trees.

How did the design respond?

The basement tanking and subsoil drainage were designed with the civil engineer to carry water safely around the building.

The ground floor sits above the designated flood level, and the upper storey is shaped around the protected trees near the boundaries. Open-plan living areas open onto raised decks that follow the slope.

What was the outcome?

Planning and building permits were obtained for a home with basement garaging that meets both overlays.

Approvals and construction in more detail

The new home replaced an existing house. Two overlays applied. The Special Building Overlay manages overland stormwater flow, and the Vegetation Protection Overlay (Schedule 1) protects significant trees. The upper storey was shaped around the protected trees near the boundaries. The City of Monash issued the planning permit, and a building permit followed.

Digging a basement on a sloping site means water has to be managed twice, once as it moves across the site and again around the basement walls. The basement tanking and subsoil drainage were designed with the civil engineer, and the roots of the protected trees had to be kept safe during excavation. The house was completed.