Articles
Guides: heritage overlay permits in Port Phillip · independent designer vs design-and-build · builders and developers. Tool: side and rear setback calculator.

What to Check Before Extending Your House in Victoria
Seven checks before you pay for design: zone and lot size, overlays, title restrictions and covenants, easements, trees, the siting rules in the Building Regulations and the permits you need, each with its source.

Feasibility Checks Before Developing Units in Victoria
Seven checks before you buy a block for a dual occupancy or townhouses: the permit pathway, Clause 55, car parking, overlays, title and easements, drainage and trees, each with its source.

Rooming House Permit in Victoria: Do You Need One?
A rooming house of up to 9 bedrooms, 12 residents and 300 square metres may not need a planning permit for the use. This guide sets out what Clause 52.23 says, what it leaves out, including overlays, title restrictions and car parking, and what to check on your house first.

Buying a Unit to Extend? What to Check Before Auction
If you are buying a property to extend it, most of the answer is in documents you can get before the auction. This guide covers where an extension can go, whether it needs a planning permit, the front setback, going up instead, and what to read in the Section 32 before you bid.

Who Pays When the Builder Misses a Detail on the Drawings?
In Victoria, a detail clearly shown on the drawings in your building contract is generally the builder’s responsibility to build as drawn. A client’s question about a bathroom window sill shows why the documentation takes precedence, what the wet-area rules say, and what to do if a detail is missed.

When Your Land Is Worth More Than Your House
New PropTrack data from September 2026 puts Albert Park at the top of Melbourne’s suburbs by land value per square metre. This article explains what that figure tells you, and why it changes how a renovation, extension or knockdown rebuild should be planned.

Building Designer or Architect: What Is the Difference?
Both can design your house and take it through permits. The guide explains how each is registered in Victoria, what each can do for a house, and the questions to ask before you choose.

How Much Does a Building Designer or Draftsman Cost?
It depends on what the quote covers. The guide explains how design fees are worked out, what each stage produces, what a cheap drafting quote often leaves out, and what to ask for before you compare.

How Much Does a House Extension Cost in Melbourne?
The Archicentre Cost Guide 2026 puts an extension at $2,700 to $5,100 per square metre including GST, for the shell only. The guide compares it with Rider Levett Bucknall’s Melbourne figures, adds kitchens and bathrooms, and works through a 40 m² example.

How Long Do Permits Take, and What Do They Cost?
Council has 60 statutory days to decide a planning permit, and a building surveyor 10 business days for a house. The guide lists the government fees for 2026-27 and how to keep the time down.

Planning Permit or Building Permit: Which Do I Need?
Often both. A planning permit decides whether the land can be developed that way; a building permit checks the work is safe and built to the rules. The guide covers the difference, the small works that need no building permit (sheds, pergolas, fences), and how to check your own property.

Do I Need a Planning Permit to Extend My House?
Sometimes. In most Victorian residential zones, extending a single house on a lot under 300 square metres needs a planning permit, and larger lots usually do not unless an overlay applies. The guide covers zones, lot size, overlays, internal remodels and the building permit you need either way.

Demolish and Rebuild: What Actually Slows You Down
A knockdown rebuild is usually held up by the planning process, not the demolition. On a St Kilda project in the City of Port Phillip, approval took two years; this article sets out why, what a request for further information involves, and how a changing flood requirement and the street were handled in the design.

Renovations and Extensions: The Real Obstacles
Renovations and extensions rarely go exactly to plan. These Melbourne examples cover a scope change in a flood zone, a design that avoided an expensive compliance pathway, work that did not need full engineering, a site that surprised everyone, and one job that moved fast.

Building a New Home: What Happens at Each Stage
Most of what decides how well a new home performs is hidden once the concrete is poured and the linings go up. This guide walks through ten stages of a new build, using a three-storey St Kilda home designed around Passive House principles, and what is worth checking before each stage is covered up.

Passive House Design: Principles Without the Full Certification Cost
Passive House is an integrated approach to a home’s design, structure, orientation and construction, not a product added at the end. This article explains why an airtight envelope needs planned ventilation, and how to apply the principles without paying for full certification.