By Phillip Mancini, registered building practitioner · Last updated 16 November 2026

The Hampton Remodel reworks the ground floor of an existing two-storey home without adding floor area. The dining room becomes a fifth bedroom, the rumpus walls come out to open a study onto the family room, and the kitchen, pantry, bathroom and laundry are rebuilt. The existing slab has hydronic heating pipes embedded in it, so the design avoids cutting into the slab.

Hampton Remodel at a glance
LocationHampton, Victoria
CouncilBayside City Council
Project typeInternal remodel of an existing two-storey home (ground floor)
Planning controlsHousing Choice and Transport Zone (Clause 32.10, HCTZ2); Development Contributions Plan Overlay (Clause 45.06, DCPO1). No planning permit needed for the internal works
StatusDesign and structural engineering completed August 2026
DesignerPhillip Mancini, Mancini Design

What were the challenges?

The owners wanted more from the house they already had: another bedroom, a study that connects to the family room, a larger kitchen with a walk-in pantry, and a proper ground-floor bathroom and laundry. All of it had to fit inside the existing ground floor.

Moving walls on the ground floor of a two-storey home means the first floor above has to be carried differently. And the ground-floor slab has hydronic heating pipes running through it, so new footings, drains or fixings cut into the slab were ruled out from the start.

How did the design respond?

The former dining room becomes a fifth bedroom with a built-in robe. The rumpus walls are removed so the study opens to the family room, and openings are taken up flush to the ceiling with no visible head. The kitchen is rebuilt around an island, with a walk-in pantry beside it and an opening sized for a larger fridge.

The old WC and laundry are reworked into a bathroom with a shower and a separate laundry. Walls around the shower and toilet are reinforced so grab rails can be added later. New windows and a sliding door have raised head heights, about 115 m² of new tiled floor runs through the living areas, and the lounge floor is screeded so the carpet sits level with the tiles.

Where walls come out, I set out replacement beams in the first-floor framing and worked with a structural engineer, using the original engineering for the house, so the loads are carried without new footings in the slab. The builder was asked to have the hydronic pipework located before any work touches the floor.

The shower is detailed so it doesn’t touch the slab either: a pre-formed shower base sits on the existing floor, the waste leaves through the external wall above slab level, and a continuous waterproof membrane runs over the base and up the wall to AS 3740. The drawing set also includes a waterproofing sheet for the other wet areas and a livable housing sheet covering step-free access, doorway widths and wall reinforcement.

What was the outcome?

Because the works are internal and don’t add floor area, the zone doesn’t require a planning permit for them. A building permit is still needed.

Design documentation and structural engineering were completed in August 2026, ready for building permit and construction.

Moving walls without losing the floor above

The owners wanted a fifth bedroom, a study open to the family room, and a rebuilt kitchen, pantry, bathroom and laundry, all inside the existing ground floor. That meant moving some ground-floor walls. Where a wall is carrying the first floor above it, moving it means the load has to be picked up somewhere else.

We added steel beams and changed the direction of some supports so the upper floor stays properly supported once the walls are moved. The structural engineer completed this work in August 2026 with the design drawings.

The slab has hydronic heating pipes in it, so the design keeps new footings, drains and fixings out of the slab. Because the work is internal and adds no floor area, a planning permit is not needed and council made no requests. The builder has asked a private building surveyor for the building permit, and the project is at that stage now.