The listing shows the house. It doesn’t show what you can build.
Before you buy, check the zone and overlays, whether the planned work needs a planning permit, the title for covenants and easements, and the siting rules that limit what you can build. In most residential zones a planning permit is required to extend one dwelling on a lot under 300 m², and overlays can add requirements.
The Planning, Feasibility & Risk Report is a fixed-price desktop assessment for buyers and owners anywhere in Victoria. It is $495 including GST. It covers zoning, overlays, title restrictions, setbacks and services, and tells you whether the property will take what you plan to build, before you bid or sign. It says so plainly when the answer is no. The delivery date is confirmed by email when you order, and the fee is deducted from your design fee invoice if you go on to a full design commission with a design fee of $2,500 or more excluding GST. It is not a cash refund.
A listing shows photos and a floor plan. It doesn’t show the overlays, easements and covenants that decide whether an extension or a second storey can go ahead, and those are the things a council or a neighbour raises after you have bought. This report gives you an independent, fixed-price assessment of what a site can support, before you are financially committed to it.
It's for buyers who want a professional opinion before auction day or before they sign, not after, whatever they plan to build:
- a single-room extension
- a larger extension or internal remodel
- a two-storey addition
- a new home or knock-down rebuild
Some properties can’t take what the buyer has in mind. The report tells you that plainly, so you find out before you bid, not after. The fee covers the assessment whatever the answer is.
What buyers often find out too late
Most of this is written into documents you can get before the auction. Three examples I see:
An overlay nobody mentioned
A heritage, flood or other overlay can bring its own planning permit requirement for building work, whatever the zone says. It is a record on the planning scheme, so it is there before you bid.
A unit that boxes you in
If the dwelling shares its lot with another dwelling, or sits on common property, extending it generally needs a planning permit. The garage, driveway, private open space, easements and front setback then reduce the space that is left.
A front setback that leaves no room
The front setback often decides whether a front extension is possible. The planning scheme sets the minimum distance from the street, and a zone schedule can change it, so the room you expect may not be there.
The report puts these in one plain-English assessment, drawn from the planning scheme, overlay data and title information, with a risk rating, and it says so plainly when the answer is no. To get a feel for it first, read what to check before auction or try the free setback calculator.
Desktop Report: $495
Every project brings its own planning constraints, site conditions and client goals. A fixed-price report on what a property will take, before you bid or sign.
A fixed-price assessment drawn from planning schemes, overlay data and title information. It covers the planning overlays and zoning controls that apply to the site, site-specific risk factors visible from records (easements, orientation and the like) and a read on what is achievable for the project you have in mind.
Prices include GST. I confirm the delivery date by email once you have paid. I am based in St Kilda and cover Victoria.
An onsite visit is optional and is not included in the $495 report fee. It can be added to a report for $350 including GST in metropolitan Melbourne (regional Victoria adds $1.50 per km from the Melbourne CBD). It is available only with a report, so book the Desktop Report first. Conditions apply.
What I need from you
What documents do you need?
After you have paid, I ask for the property address and what you want to build, on a short details page. I also ask you to email the Section 32 vendor statement (the owner’s disclosure statement) and the contract documents. The title and plan of subdivision are normally included with them. If you have floor plans, send those too, because they let me give a first read on which walls look load-bearing. Put the property address in the subject line of the email.
Do you check services and structure?
I locate sewer, stormwater and other services from the plans. That is location only, not condition. Where floor plans are available, I give a read on which walls look load-bearing and how I would deal with them. That read comes from the plans alone, so an engineer needs to confirm it before you build.
What does the report not cover?
Owners corporation rules and the contract terms are for your conveyancer. If you are worried about the condition of the building, get a pre-purchase building inspection before you bid. The report is not legal, survey or engineering advice, and it can’t guarantee that an application will be approved.
Is this advice on whether to bid?
No. It tells you what the site is likely to allow. Whether to bid is your decision, made with your conveyancer and other advisers.
Is the report worth doing on a tight site?
A tight site is where the report earns its fee, because it shows early what the block will and won’t take. You pay for the assessment whichever way it comes out.
Good to Know
How does ordering work?
The report is paid upfront, before I start work. After you request a report, an invoice arrives in your inbox from Square with a secure link to pay by card. Once you have paid, I confirm the delivery date by email. Prices include GST. There is no obligation to proceed further: you are paying for an independent assessment, not committing to a design engagement.
What if I go ahead with a full design after this?
If you proceed with Mancini Design for a full design commission with a design fee of $2,500 or more excluding GST, the report fee is deducted from your design fee invoice. It is a credit against that invoice only, not a cash refund. If you do not proceed, or the design fee is below $2,500 excluding GST, no credit applies.
Do you do reports on units and shared lots?
Yes. If the dwelling shares its lot with another dwelling, or sits on common property, extending it generally needs a planning permit whatever the size of the lot. The title and plan of subdivision show which applies. I don’t cover owners corporation rules, so your conveyancer should check those.
What if the report says my plan won’t work?
Then you know before you commit to the purchase. The report also sets out what the site could take instead.
What if I change my plans after the report?
If the report’s findings already answer the change, I update it at no charge. If the change needs the site assessed again, for example a second storey instead of a single-storey extension, the reassessment is $247.50 including GST. I confirm which applies before any work.
Buying to extend? Read what to check before auction.
Before you order, you are welcome to ask a question about your circumstances and any deadlines, so you can decide whether the report suits you.
Request a Report
Fill in this form once. An invoice arrives in your inbox from Square, with a secure link to pay by card. Once you have paid, I send you to a short details page for the property address and what you want to build, and confirm the delivery date by email. I start work when the payment comes through.
See What You Receive
This is a sample report for an invented property. It shows the depth, structure and plain-English explanations you can expect for your own property. Tap a page to enlarge it.
The sample is shown on screen only. A full report runs to about nine pages.
Read the sample report as text
SAMPLE REPORT, invented property. The property, measurements, dates, documents and findings are all invented. The planning and building rules quoted are real. Subject site: a 10.0 m by 40.0 m lot (400 m²) in a General Residential Zone with a Heritage Overlay. Existing single-storey weatherboard house, graded contributory. Request: an upper floor of about 60 m² and a 3.0 m rear extension, for a buyer before auction. Prepared by Phillip Mancini, Registered Building Practitioner, 8 November 2026.
Summary and risk rating
Overall risk: moderate. The property can take an upper floor and the rear extension, but not as drawn. A smaller upper level, set back from the front rooms and both side boundaries, is the version council is likely to support.
| Area | Rating | What it means for you |
|---|---|---|
| Planning permit | Moderate | The Heritage Overlay means a planning permit is needed for the upper floor and the extension. |
| Heritage | Moderate | A contributory house keeps its front rooms and roof. An upper level is usually accepted only where it sits well back and low in views from the street. |
| Siting rules | High as drawn | As drawn, the upper floor is too close to both side boundaries. Set back as in Option B, the numbers work. |
| Overlooking and overshadowing | Confirm | Upstairs windows need screening or high sills, and shadow diagrams are needed. |
| Title | Low | A 2.0 m drainage easement runs along the rear. The extension stays clear of it. |
| Existing structure | Confirm | An engineer confirms the stumps and frame can carry a second level. |
Building siting rules
The Heritage Overlay brings a planning permit, so council assesses the Clause 54 standards. The building surveyor then checks the matching Part 5 regulations. Upper wall height: 6.6 m.
| Rule | Requirement | This site | Status |
|---|---|---|---|
| Side setback, north (A2-3) | 1.9 m for a 6.6 m wall | A: 1.2 m. B: 2.0 m | Not met (A), achievable (B) |
| Neighbour’s north-facing window (A4-2) | 2.8 m for a 6.6 m wall | A: 1.2 m. B: 3.0 m | Not met (A), achievable (B) |
| Site coverage (A2-5) | 65% in the General Residential Zone | About 38% | Achievable |
| Permeability (A5-1) | At least 20% | About 45% | Achievable |
| Private open space (A3-2) | 20% of the lot, not less than 25 m² | About 150 m² | Achievable |
| Overshadowing and overlooking (A4-3, A4-4) | Neighbours’ sun on 22 September; views within 9 m avoided | Shadow diagrams and screening | Confirm |
Development options and verdicts
| Option | What it is | Verdict |
|---|---|---|
| A. As requested | Upper floor of about 60 m² over the front, 1.2 m from each side, plus the rear extension | Unlikely |
| B. Adjusted (recommended) | Upper floor of about 48 m², 8.0 m behind the front wall, 2.0 m and 3.0 m from the sides, plus the rear extension | Possible |
| C. Alternative | No upper floor: a single-storey rear extension of about 45 m² | Likely |
Indicative costings
Option B, 69 m², Tier 2 with a planning permit: indicative build cost $241,500 to $379,500, and an indicative Mancini Design fee of $9,500 (the minimum) to $24,700 plus GST. This is a range estimate from floor area only, not a quote. The design fee is confirmed in a written Design Services Fee Proposal.
Recommended next steps
- Before you bid: ask council for the heritage citation and whether it offers a pre-application meeting.
- After purchase: an engineer’s inspection of stumps and frame, and a feature and level survey.
- Raise any contract concerns with your conveyancer.
- If you go ahead with a full design commission with a design fee of $2,500 or more excluding GST, the fee for this report is deducted from your design fee invoice. It is not a cash refund.
Scope and limitations: desktop assessment only, not legal, survey or engineering advice. The costings are range estimates, not a quote. It is not advice on whether to bid or buy, or on price. No guarantee of approval, and controls change over time.
What’s in the report
- An overall risk rating with the key findings in plain English
- Whether your plans need a planning permit, and why
- Your zone and what it allows on the site
- Every overlay affecting the property and its practical impact
- The building siting rules that apply, and whether they can be met
- Site constraints such as protected trees, easements and levels
- Realistic development options, from extending to rebuilding
- Indicative build cost and design fee ranges for your plan and the recommended option. They are range estimates from floor area, not a quote.
- A risk summary table showing how each risk can be managed
- Restrictions from the title and plan of subdivision, such as easements and common property
- Where sewer, stormwater and other services run (location only, from the plans)
- An indicative read on which walls are load-bearing, from the plans alone. An engineer confirms it before you build
- Recommended next steps before you sign