Check the site before you buy or build: an independent verdict on your rooming house plan.
This report tests whether your house can be a rooming house without a planning permit for the use, in the zones listed in Clause 52.23. The tests are no more than 9 bedrooms, 12 residents and 300 m² of floor area, and the zone’s conditions met. It also checks the building work conditions, overlays, car parking and the title.
The Rooming House Planning & Feasibility Report is a fixed-price desktop assessment for owners and buyers of property in Victoria. It is $495 including GST. It tests whether a house can be converted, extended or built new as a rooming house, and whether that can be done without a planning permit under Clause 52.23 of the planning scheme. It covers the zone, overlays, title restrictions, car parking and the next steps. It says so plainly when the answer is no. The delivery date is confirmed by email when you order, and the fee is deducted from your design fee invoice if you go on to a full design commission with a design fee of $2,500 or more excluding GST. It is not a cash refund.
I am Phillip Mancini, a registered building practitioner with 30 years’ construction industry experience. I am an independent building designer and I don’t build, so nothing in the report is shaped by a construction sale. If your site won’t work, you hear it from me before you spend more.
People come to this report for three main reasons. Some want to get more from a house they already own. Others are weighing up a unit development. A third group holds a development site where higher build costs and a softer market have put the numbers under pressure, and they want to know whether the house already on it could be a rooming house instead. The Australian Bureau of Statistics reports that house construction prices rose in the June quarter 2026 and that the total value of Victorian dwellings fell 1.6% in the same quarter. The report answers the planning half of that decision. It does not cover returns. Build cost and design fee are shown as indicative ranges only.
A rooming house of up to 9 bedrooms, 12 residents and 300 m² can avoid a planning permit for the zone in many residential and mixed use areas. Whether yours can depends on small details: how the floor area is measured, whether every bedroom opens from inside, whether a shared kitchen and living area are kept, the garden area rule, and overlays that ask for a permit of their own. This report works through all of them for your site, before you spend money on drawings or a contract.
It is for owners and buyers who want a professional opinion first, whichever route they have in mind:
- convert the house you already own
- add bedrooms to an existing house
- decide whether a rooming house is worth pursuing before you commit to a larger development
- find out whether the house on a stalled development site could be a rooming house instead
- build a new rooming house
- buy a house to turn into a rooming house, and check it before you bid or sign
The report looks at two ways forward for your site. Option A uses the house you have, for example 4 bedrooms with no new building. Option B adds to the rear, for up to 9 bedrooms if the garden area, floor area and overlays allow it. You get a verdict for each.
Some sites can’t take what the owner or buyer has in mind. The report tells you that plainly, and sets out what the site could take instead. The fee covers the assessment whatever the answer is.
Desktop Report: $495
A fixed-price report on whether your site will take a rooming house without a planning permit, and what to do next.
It is drawn from the planning scheme, overlay data, title information and the Victorian regulations. It is a short report that covers the exemption test, the overlays and title restrictions that could still need a permit, parking, and realistic options with a verdict for each.
Prices include GST. I confirm the delivery date by email once you have paid. I am based in St Kilda and cover Victoria.
An onsite visit is optional and is not included in the $495 report fee. It can be added to a report for $350 including GST in metropolitan Melbourne (regional Victoria adds $1.50 per km from the Melbourne CBD). It is available only with a report, so book the Desktop Report first. Conditions apply.
Common questions
Do I need a planning permit to turn a house into a rooming house?
Often not, for the zone. Clause 52.23 exempts the use of land for a rooming house in the General Residential, Neighbourhood Residential, Residential Growth, Mixed Use, Township and several other zones if the building has no more than 9 bedrooms and 12 residents and a floor area of 300 m² or less. If you also build or extend, the buildings and works exemption adds conditions: every bedroom is reached from inside the building, a shared kitchen and living area are provided, and in the General Residential and Neighbourhood Residential Zones the garden area rule is met. Overlays, covenants and parking rules are separate, so the report checks each one for your site.
Does every bedroom need its own bathroom?
No. Regulation 20 of the Public Health and Wellbeing (Prescribed Accommodation) Regulations 2020 requires at least one toilet, one bath or shower and one washbasin for every 10 people, or part of 10, living there. Consumer Affairs Victoria sets the same ratio in its minimum standards. A shared bathroom can comply, and ensuites are a design choice, not a requirement.
Do I need a lounge, and is there a minimum kitchen size?
The planning exemption for new building work needs a shared kitchen and living area, with no size set. Neither the National Construction Code nor the Consumer Affairs Victoria standards require a lounge, and neither sets a minimum kitchen floor area. The standards do set what the kitchen must contain, such as the oven and cooktop ratio and fridge capacity. Dining needs a table and chairs for the most people in any one room, which the regulations allow in the room or in a shared area.
Does a rooming house need car parking?
Often yes. Clause 52.23 can exempt the use from needing a planning permit in the zone, but it does not waive Clause 52.06, so car parking still applies. The requirement is set per bedroom and depends on the car parking category shown on the planning maps for the address. In Categories 1 and 2 the minimum is 0.25 spaces per bedroom, rounded down, so 8 or 9 bedrooms need 2 spaces. In Categories 3 and 4 there is no minimum and a maximum applies instead. A Parking Overlay can change the rates. The report reads the category and overlays for your site.
Is a house with self-contained studios still a rooming house?
Not necessarily. In Studio Homes Victoria Pty Ltd v Brimbank CC [2022] VCAT 1371, studios that each had a kitchenette, their own hot water, separate meters and letterboxes were treated as self-contained accommodation, not a rooming house, even though the numbers met Clause 52.23. The residents of a rooming house have to rely on shared facilities. If your design gives every room its own kitchen and services, the report flags the risk early.
Want the background first? Read Rooming House Permit in Victoria: Do You Need One?
What I need from you
What documents do you need?
Once you have paid, I ask for the property address and what you plan to do, on a short details page. I ask whether you own the property or are thinking of buying it, because the documents and the report differ. Owners send the title and plan of subdivision, any approved plans and permit history, and floor plans. Buyers send the Section 32 vendor statement and contract documents, with the title and plan of subdivision, and floor plans if they have them.
What does the report not cover?
Costs, rental returns and valuations are not covered. Owners corporation rules and contract terms are for your conveyancer. If you are worried about the condition of a building, get a building inspection. The report is not legal, survey or engineering advice, and it can’t guarantee that an application will be approved.
I am thinking of buying. Is this advice on whether to bid?
No. It tells you what the site is likely to allow. Whether to bid is your decision, made with your conveyancer and other advisers.
What if the report says my plan won’t work?
Then you know before you spend more. The report also sets out what the site could take instead, such as a smaller conversion or a different route.
Good to Know
How does ordering work?
The report is paid upfront, before I start work. After you request a report, an invoice arrives in your inbox from Square with a secure link to pay by card. Once you have paid, I send you to a short details page and confirm the delivery date by email. Prices include GST. There is no obligation to proceed further: you are paying for an independent assessment, not committing to a design engagement.
What if I go ahead with a full design after this?
If you proceed with Mancini Design for a full design commission with a design fee of $2,500 or more excluding GST, the report fee is deducted from your design fee invoice. It is a credit against that invoice only, not a cash refund. If you do not proceed, or the design fee is below $2,500 excluding GST, no credit applies.
What if I change my plans after the report?
If the report’s findings already answer the change, I update it at no charge. If the change needs the site assessed again, for example a second storey instead of a single-storey extension, the reassessment is $247.50 including GST. I confirm which applies before any work.
Before you order, you are welcome to ask a question about your circumstances and any deadlines, so you can decide whether the report suits you.
Request a Report
Fill in this form once. An invoice arrives in your inbox from Square, with a secure link to pay by card. Once you have paid, I send you to a short details page for the address and your plans, and confirm the delivery date by email. I start work when the payment comes through.
See What You Receive
This is a sample report for an invented property. It shows the depth, structure and plain-English explanations you can expect for your own site. Tap a page to enlarge it.
The sample is shown on screen only. A report for your own site works through your property and your plans.
Read the sample report as text
SAMPLE REPORT, invented property. The site below is invented. Subject site: Sample Site, City of Sample Council, about 720 m². Prepared by Phillip Mancini, Registered Building Practitioner, October 2026.
Summary
Overall risk: moderate. Option A (4 bedrooms in the existing house) is likely to need no planning permit, with low risk. Option B (8 bedrooms with a rear addition) is possible, with moderate risk, because it depends on the garden area and on a protected tree near the rear boundary. In both options the bedrooms are bedrooms only, with the kitchen, dining and living shared. A building permit, Council registration and a rooming house operator licence are needed either way.
Why the planning pathway works
Clause 52.23 means a rooming house in the General Residential Zone does not need a planning permit for the use if it has no more than 9 bedrooms and 12 residents and the floor area of all buildings is 300 m² or less, measured from the outside of the walls and excluding outbuildings. Option A has 4 bedrooms and about 115 m². Option B has 8 bedrooms and about 210 m².
For the new building work, every bedroom must be reached from inside the building, a shared kitchen and living area must be provided, and the garden area must be kept. On this lot that is 35%, about 252 m², and about 470 m² is garden today. The tree overlay is the reason Option B is moderate: an arborist must confirm the addition sits outside the protection zone.
A heritage management plan is not expected, because a single house converted to a rooming house is not a listed high impact activity. Parking needs 0.25 spaces per bedroom, rounded down: 1 space for Option A and 2 for Option B.
Indicative costings
Option A has no new floor area, so only the Tier 1 minimum design fee applies: $3,500 plus GST. Option B, a rear addition of about 95 m² (Tier 1, no planning permit): indicative build cost $237,500 to $332,500, and an indicative Mancini Design fee of $7,100 to $13,300 plus GST. These are range estimates from floor area only, not a quote.
Recommended next steps
- Order the title and check for easements and covenants.
- Commission an arborist assessment and a feature and level survey.
- Ask Council planning for written confirmation that no planning permit is needed.
- Engage a building surveyor. A building permit is required for the change of use.
- Follow the Council health steps and apply for the operator licence.
- If you go ahead with a full design commission with a design fee of $2,500 or more excluding GST, the fee for this report is deducted from your design fee invoice. It is not a cash refund.
Scope and limitations: desktop assessment only, not legal, survey or engineering advice. The costings are range estimates, not a quote, and it does not cover rent or returns. No guarantee of approval, and controls change over time. This sample describes an invented property.
What’s in the report
- An overall risk rating and a verdict for each option, in plain English
- Indicative build cost and design fee ranges for your plan and the recommended option. They are range estimates from floor area, not a quote.
- Whether your plan needs a planning permit, and why
- The Clause 52.23 exemption test, checked condition by condition
- Your zone, the garden area rule and the parking rate
- Every overlay on the property, including any that could ask for a permit of their own
- Restrictions from the title and plan of subdivision, such as easements and covenants
- Whether cultural heritage is likely to be an issue
- Recommended next steps, in order