By Phillip Mancini, registered building practitioner · Last updated 24 October 2026

The St Kilda Residence is a new three-storey home with a double garage that I designed as a development, on a site in a Special Building Overlay. Melbourne Water required the living floor 600 mm and the garage 300 mm above the 2040 Port Phillip Bay flood level of 1.8 m AHD. The planning permit was issued in September 2019, and the home has been built.

St Kilda Residence at a glance
LocationSt Kilda, Victoria
CouncilCity of Port Phillip
Project typeNew three-storey home with double garage (development project)
Planning controlsSpecial Building Overlay (SBO1); Melbourne Water minimum floor levels
StatusPlanning permit issued September 2019; home since built
DesignerPhillip Mancini, Mancini Design

What were the challenges?

The site is in a Special Building Overlay (SBO1), so Melbourne Water had to be satisfied before council could issue a permit. Its concern here was Port Phillip Bay flooding and sea-level rise: the bay flood level is set at 1.8 m AHD for 2040, rising further by 2100.

Melbourne Water required the dwelling floor to sit 600 mm above that 2040 level and the garage floor 300 mm above it. Its first response found the floor levels on the plans too low, so they had to be lifted. That had to happen while keeping the building within the height limits, keeping a workable driveway grade into the garage, and meeting ResCode setback, overlooking and overshadowing standards.

How did the design respond?

Melbourne Water raised its flood level requirements part-way through the application, so the floor had to go up. Because the height limit is measured from natural ground level, I negotiated with council so the raised floor wasn’t penalised under the original height limit.

The raised floor meant the entry needed steps and the garage needed a ramp. I designed the entry as a series of 1.0 m by 1.0 m platforms, so the rise to the front door reads as part of the design rather than a plain flight of stairs.

The narrow block sits between a single-storey house and an existing three-storey building. That neighbour, plus other recent three-storey approvals nearby, supported the case for the home’s scale. Council’s request for further information focused on how the house would sit in the street, and the response addressed that directly.

The application also included removing an easement of light and air on the western boundary, which the permit allowed.

What was the outcome?

Planning approval took about two years, partly because the council planning officer changed during assessment. The City of Port Phillip issued the permit in September 2019 for a three-storey dwelling with double garage and removal of the easement.

The home has since been built, designed around Passive House principles, including 100 mm of rigid insulation under the slab.

The home and its Passive House features

The site is about 240 square metres and the home has four bedrooms. The application was lodged with the City of Port Phillip in 2018 and approved in late 2019, about two years later.

The build follows Passive House principles: thermally broken windows, wall insulation, and an internal airtightness layer made from Intello membrane, with Tescon Vana tape on the ceiling joins.

Fresh air comes through a dedicated Zehnder heat recovery ventilation system. Any vent that opens to the outside air is sealed airtight when it is not in use.

There is no gas connected. The home is all electric, and the appliances are high star rated.

The swimming pool was built, along with a small spa that can be heated separately.

Building the house

Construction started in 2020, just as COVID-19 arrived, and finished in the middle of 2022. The build was slowed by material supply problems, rising material costs and the Victorian lockdown rules that capped the number of workers allowed on site.

This was a development project.