By Phillip Mancini, registered building practitioner · Last updated 24 October 2026

The Bentleigh Residence is two family-sized townhouses on a standard suburban block in Glen Eira. The design keeps the look of a single house from the street, faces the living areas north onto private backyards, and steps the upper floors in to avoid overshadowing and overlooking neighbours. It reached the building permit stage in early 2014.

Bentleigh Residence at a glance
LocationBentleigh, Victoria
CouncilCity of Glen Eira
Project typeTwo dwellings on a lot
Planning controlsResidential zone; Development Contributions Plan Overlay (DCPO1); ResCode Clause 55
StatusPlanning permit granted; building permit stage early 2014
DesignerPhillip Mancini, Mancini Design

What were the challenges?

The aim was to get the most out of two family homes on an ordinary suburban block while meeting Glen Eira's side setback rules and the ResCode standards for two dwellings on a lot.

Each home needed its own private open space and its own garage without the garages dominating the street.

How did the design respond?

The pair was designed to read as a single dwelling from the street.

Living areas face north and open onto landscaped backyards. The upper floors are stepped in from the boundaries to avoid overshadowing next door and to keep views out of the neighbours' private open space.

What was the outcome?

Planning approval was granted for the two dwellings, and the project went to the building permit stage in early 2014.

Approvals in more detail

Two dwellings on one lot are assessed against ResCode in Clause 55, which covers setbacks, private open space, overlooking, overshadowing and car parking. The site also falls under a Development Contributions Plan Overlay.

The application drew a number of objections from neighbours, mostly about the height of the buildings and overlooking from the upper-floor windows. The design met the planning rules on both points. Council still held a mediation, which stretched the timeline, and the planning permit was granted once it was confirmed that the design complied.

Documents for the building permit were prepared in early 2014. The townhouses were completed around 2016.

Thinking about two or more homes on your own block? The Unit Development Feasibility Report checks what the block may take before you design.