Before You Design or Build

Two or more homes on one block? Check what it will take first.

In most residential zones, building two or more dwellings on a lot needs a planning permit, assessed against Clause 55, the Townhouse and Low-rise Code, for buildings up to three storeys. Before design, check the lot width and depth, car parking under Clause 52.06, overlays, the title and easements, drainage and trees.

The Unit Development Planning & Feasibility Report is a fixed-price desktop assessment for owners and buyers of property in Victoria. It is $495 including GST. It tests whether a block can take two or more dwellings, from a dual occupancy to a small unit development, and what it will need. It covers the zone, overlays, title restrictions, the planning standards for multiple dwellings, car parking, the building rules and the next steps. It says so plainly when the answer is no. The delivery date is confirmed by email when you order, and the fee is deducted from your design fee invoice if you go on to a full design commission with a design fee of $2,500 or more excluding GST. It is not a cash refund.

Two or more dwellings on a lot generally need a planning permit in a residential zone. The application is assessed against the multiple dwelling standards in the planning scheme (Clause 55 for buildings of three storeys or less), which look at neighbourhood character, the layout of the homes, the effect on neighbours and sustainability. Car parking, overlays and any restrictions on the title are assessed as well, and the building permit has its own rules under the National Construction Code and the Building Regulations.

A block can take more than one home only if many small details work. These include the width and depth of the lot, street and boundary setbacks, building height, how much of the lot the buildings cover, permeable ground, and private open space and solar access for each home. They also include car parking and driveway access, easements and trees, and the effect on your neighbours’ windows, open space and solar panels. This report works through them for your block, before you spend money on drawings or a builder.

Councils apply the standards differently, and some have particular requirements in a zone schedule or an overlay. The report for your block picks up what applies in your Council’s planning scheme.

It is for owners and buyers who want a professional opinion first:

  • add a second home to a block you already own
  • decide whether a townhouse or unit development is worth pursuing before you pay for design
  • buy a property with development potential, and check it before you bid or sign
  • find out how many homes, and what layout, your block will actually take

The report looks at realistic options for the block, from two dwellings up to a larger number where the block allows it, and gives you a verdict for each. It covers what your block will take. It does not forecast sale values, rent or returns, and tax, land tax and finance are questions for your accountant.

For the checks in the order they tend to matter, read feasibility checks before developing units in Victoria.

Some blocks can’t take what the owner has in mind. The report tells you that plainly, and sets out what the block could take instead. The fee covers the assessment whatever the answer is.

Desktop Report: $495

A fixed-price report on whether your block will take two or more dwellings, and what to do next.

It is drawn from the planning scheme, overlay data, title information, the Building Regulations and the National Construction Code. It covers the permit pathway, the multiple dwelling standards, car parking, the overlays and title restrictions that could still matter, and realistic options with a verdict for each.

Prices include GST. I confirm the delivery date by email once you have paid. I am based in St Kilda and cover Victoria.

An onsite visit is optional and is not included in the $495 report fee. It can be added to a report for $350 including GST in metropolitan Melbourne (regional Victoria adds $1.50 per km from the Melbourne CBD). It is available only with a report, so book the Desktop Report first. Conditions apply.

Common questions

Do I need a planning permit for two or more dwellings on a lot in Victoria?

Generally yes. In most residential zones, a planning permit is required to construct a dwelling if there is already one on the lot, and to construct two or more dwellings on a lot. It is also required to extend a dwelling where there are two or more on the lot. In the General Residential Zone, the application may be a VicSmart application, a faster 10 day process, if the combined total of new and existing dwellings is four or fewer and the listed Clause 55 standards are met. A building permit is needed as well. Overlays and the zone schedule can add requirements, and a zone schedule can change a standard. The report works out which apply to your block.

What are the planning standards for multiple dwellings?

Clause 55 of the planning scheme is the Townhouse and Low-rise Code, introduced in 2025 and updated by Amendment VC315 on 24 September 2026. It applies to two or more dwellings on a lot and to residential buildings of up to three storeys. It uses a deemed to comply approach: if a development meets a standard, the matching objective is deemed to be met. The standards cover neighbourhood character (street setback, building height, side and rear setbacks, walls on boundaries, site coverage, access, tree canopy and front fences), liveability, external amenity and sustainability. Where all the applicable standards are met, there is no third-party right of appeal. Clause 55 does not apply to developments of four or more storeys, and Clause 57 applies to four to six storeys. Source: Department of Transport and Planning, Townhouse and Low-Rise Code.

How many dwellings can my block take?

There is no fixed number. It depends on the block: the width and depth of the lot, the setbacks, the height, site coverage, open space, car parking and access all limit it. The report tests realistic options and gives a verdict for each.

What stops a unit development most often?

Common problems include not enough width for a driveway and the setbacks, and car parking that cannot be fitted or reached. Others are private open space and solar access for each dwelling, and overshadowing and overlooking of neighbours. Further problems are a sewer or drainage easement, protected trees, an overlay such as heritage, neighbourhood character or flooding, and a covenant or restriction on the title. The report checks each one.

What about car parking?

Car parking is assessed under Clause 52.06 of the planning scheme. The requirement depends on the use and on the land category shown on the Car Parking Requirement maps, and the minimum number of spaces must be provided on the land or in accordance with a permit. Table 1 of the clause can also set a maximum. A planning permit is needed to reduce the number of spaces. Clause 52.06 does not apply to extending one dwelling on a lot in the six main residential zones. It also does not apply to building one dwelling there unless the zone requires a planning permit for it (for example on a lot under 300 m²). The report works out the requirement for your block and whether the layout can fit it.

Does the report cover the building rules?

Yes. It looks at the National Construction Code, the Building Regulations and the Victorian Building Authority’s Building Practice Notes for the matters that can change a layout, where they apply: fire protection of the walls between dwellings, sound insulation, siting, energy efficiency, drainage and flood hazard.

Do councils have their own requirements?

Yes. A council can add requirements through a schedule to the zone, an overlay or local planning policy. The report for your block picks up what applies in your Council’s planning scheme.

How does ordering work?

The report is paid upfront, before I start work. After you request a report, an invoice arrives in your inbox from Square with a secure link to pay by card. Prices include GST. There is no obligation to proceed further. If you then engage Mancini Design for a full design commission with a design fee of $2,500 or more excluding GST, the report fee is deducted from your design fee invoice. It is a credit against that invoice only, not a cash refund. If you do not proceed, or the design fee is below $2,500 excluding GST, no credit applies.

What documents do you need?

After you have paid, I ask for the property address and what you have in mind, your certificate of title and plan of subdivision, your plans if you have them, and photos of the street frontage, the existing house and the rear of the block. If you are thinking of buying, I also ask for the Section 32 and contract documents.

What if my block can’t take what I have in mind?

Then you know before you spend on design. The report also sets out what the block could take instead. You pay for the assessment whichever way it comes out.

What does the report not cover?

It is a desktop assessment from public planning information and the documents you supply. There is no site inspection, survey, soil testing or arborist inspection. It does not cover subdivision of the land, sale values, rent or returns. It is not legal, survey, engineering, tax or financial advice, and it does not guarantee that a permit will be issued. Controls change, so confirm the findings with Council before you rely on them.

What if I change my plans after the report?

If the report’s findings already answer the change, I update it at no charge. If the change needs the site assessed again, for example three dwellings instead of two, the reassessment is $247.50 including GST. I confirm which applies before any work.

Before you order, you are welcome to ask a question about your circumstances and any deadlines, so you can decide whether the report suits you.

Request

Request a Report

Fill in this form once. An invoice arrives in your inbox from Square, with a secure link to pay by card. Once you have paid, I send you to a short details page for the address and your plans, and confirm the delivery date by email. I start work when the payment comes through.

Do you already own the property?

Please note: this is a desktop assessment of publicly available planning information and the documents you supply. It is planning and building design guidance, not legal, survey, engineering, tax or financial advice, and it does not guarantee that a permit will be granted. Planning controls change, so confirm the findings with Council before you rely on them.

Your details are used only for this report. Your name and email are passed to Square so it can send you the invoice. They are never added to a mailing list.

The Report

What You Receive

A sample for this report type is not available yet. All Mancini Design reports follow the same layout, so you can see the style and the plain-English explanations in the sample for the Planning, Feasibility & Risk Report. It is a guide only: a report for your own block needs a full assessment of your site and your documents.

What’s in the report

  • An overall risk rating and a verdict for each option, in plain English
  • Whether your block needs a planning permit, and why
  • Your zone and what it allows
  • Every overlay on the property and its practical effect
  • The multiple dwelling standards (Clause 55) and whether your block can meet them: setbacks, height, site coverage, permeable ground, private open space, solar access, daylight, overlooking and overshadowing
  • The car parking requirement (Clause 52.06) and whether the layout can fit it
  • Restrictions from the title and plan of subdivision, such as easements and covenants
  • Protected trees, and neighbours’ windows, open space and solar panels that affect where the buildings can go
  • Where sewer, stormwater and other services run (location only, from the plans)
  • The building rules that affect the layout: the National Construction Code, the Building Regulations and the Building Practice Notes, including fire protection between dwellings, sound insulation, siting, energy efficiency and drainage
  • Your Council’s own requirements, such as a zone schedule or overlay, picked up for your block
  • Realistic options from two dwellings up, with a verdict for each
  • Recommended next steps, in order