Buying a Unit to Extend? What to Check Before Auction

Where an extension can go, whether it needs a permit, and what to read before you bid

By Phillip Mancini, registered building practitioner, Mancini Design, St Kilda · Published 24 October 2026 · Last updated 17 November 2026

Before buying a unit to extend, check where an extension can physically go once the garage, driveway, private open space and front setback are counted. Also check whether the zone and overlays may need a planning permit, any easements and services, and which walls are load-bearing. The title and plan of subdivision show which land is yours.

If you are buying a property because you plan to extend it, the time to find out whether that is possible is before you bid, not after settlement. Most of the answer is in documents you can get before auction: the Section 32 vendor statement, the title and plan of subdivision, and the floor plans. Here is what I look at, using a recent enquiry as an example.

A Recent Example

A couple were bidding on the front unit of a two-lot subdivision in Melbourne’s north, with the auction less than two weeks away. They wanted one or two more bedrooms and an ensuite.

The unit was boxed in. The garage was behind it, the driveway to the rear unit ran down one side, and the private open space was on the other. The only place left to extend was the front, inside the front setback, and I doubted that left room for one or two bedrooms and an ensuite.

I told them that before they paid for anything, and that it was a first look only, not advice on whether to bid. A two-storey addition might be worth exploring later, but that is a separate piece of work and I could not say yet whether it would work.

1. Where Can the Extension Actually Go?

Start with the title and plan of subdivision, not the real estate photos. They show which land is yours and which is common property. Then rule out the parts of your lot that are already used: the garage, the driveway, the private open space and any easements. Whatever is left is where an extension can go.

2. Does It Need a Planning Permit?

That depends on the zone, the size of the lot and any overlays. The state’s single-dwelling rules in Clause 54 of the Victorian planning scheme apply to building or extending one dwelling on a lot under 300 square metres in the listed residential and mixed-use zones. Larger lots are generally dealt with through the building permit process instead. Overlays such as heritage, flooding or vegetation can add their own permit requirements whatever the zone says, and a building permit is needed for structural work in any case.

If the dwelling is on common property, extending it needs a planning permit and the owners corporation’s involvement. The only reliable answer for a particular property comes from its zone, overlays and title, which is what I check. For a house on its own lot, see what to check before extending a house.

3. The Front Setback

The front setback often decides whether a front extension is possible. Standard A2-1 in Clause 54.02-1 sets the minimum distance from the street. With a house on each side facing the same street, it is the lesser of the two neighbours’ front wall setbacks, or 6 metres, whichever is less. If only one neighbour has a building, it is that building’s setback or 6 metres. If neither does, it is 4 metres on most streets and 6 metres on major roads (Transport Zone 2). A zone schedule can set a different distance.

Porches, pergolas and verandahs under 3.6 metres high, and eaves, may encroach up to 2.5 metres into the setback. So the space available at the front is your existing setback minus the minimum, and it can be less than you would expect.

4. Going Up Instead

If there is no room to spread out, a first-floor addition may work. Height limits depend on the zone and any overlay. Overlooking, overshadowing, how the stairs fit and whether the existing structure can carry a second storey all need checking. The setback calculator shows what a side or rear wall height needs. That is a design question, so I would only give a first view before auction.

5. Services and Easements

Sewer and stormwater lines, and the easements they sit in, can rule out the obvious spot for an extension. Building over or near them needs the authority’s consent and can add cost. I locate them from the plans. That is location only, not condition, which is a job for a plumber or a CCTV drain inspection.

6. Load-Bearing Walls

Floor plans usually show enough to tell which walls look load-bearing and how I would deal with them. That read comes from the plans alone, so a structural engineer needs to confirm it before anything is built.

7. What Is Not a Designer’s Job

Owners corporation rules and the contract terms are for your conveyancer. If you are worried about the condition of the building, get an independent pre-purchase building inspection before you bid. A report like mine is not legal, survey or engineering advice, it is not advice on whether to bid, and it cannot guarantee that an application will be approved.

Before Auction

My Planning, Feasibility & Risk Report (the Desktop Report) is $495 including GST, fixed price. I need the Section 32 vendor statement and the contract documents, which normally include the title and plan of subdivision. Floor plans help too. If you are working to an auction date, get in touch as early as you can. If a property cannot take what you want, the report says so plainly and sets out what it could take instead. If you are looking at other properties, it is worth doing the report on one with room to build.

Common Questions

Can I extend a unit on a subdivided block?

Often yes, but the space is usually tighter than it looks. The title and plan of subdivision show which land is yours and which is common property. The garage, driveway, private open space, easements and front setback then reduce what is left.

Can you tell which walls are load-bearing before I buy?

I can give a read from the floor plans on which walls look load-bearing. It comes from the plans alone, so a structural engineer needs to confirm it before any work is done.

Is a first look the same as advice on whether to bid?

No. A first look tells you what the site is likely to allow. Whether to bid is your decision, made with your conveyancer and other advisers.

Sources: Department of Transport and Planning, one dwelling on a lot guide and one dwelling and small second dwelling guidelines (September 2025).